Saturday, January 17, 2009

17 January

Typical, mundane construction details slowed things down a bit this week, but the drywall crew arrived Friday and are making time like nobody's business.


Ryan Becker and his drywall crew in the west wing hall way.

The offices are now walled off from the Worship space. That is the front doorway to the left. (The door will be changed.) and some of the sprinkler pipe on the floor.
Up in the attic above the offices, next to the storage loft (which might be partly youth assembly area) there are sprinker pipes going in.
Sprinker pipes above, and electrical conduit below.
Karen's office looking toward pastor's.
Standing back by the kitchen, the north wall of the hallway.
And the south wall. (There is a temporary cover at the end to keep the heat in for the coffee hour and tour on Sunday!)