They did some work on Monday as well, but it was mostly small, inside stuff, and I do not go inside when the guys with the tools and hardhats are working.
4. In the hallway, kitchen on the left, classrooms & offices on right, looking east into the Worship space.
The Double classroom (a portable divider wall will be installed.)
The warmest part of the building, as of now: the basement.
No comments:
Post a Comment